HydraulicsEasy
Routine Maintenance

Greasing All Points

Lubricate all grease points to prevent wear and ensure smooth operation of moving parts.

Estimated: 45-60 mins
1 model-specific guide
General Guide

Complete Greasing Procedure

Regular greasing prevents premature wear of pivot points and bushings. Most mini excavators have 15-25 grease points that should be serviced every 8-10 operating hours.

Tools Required:

Grease gunShop ragsGrease fitting cleaner

Safety Notes

  • Clean grease fittings before pumping to prevent contamination

General Steps:

1

Gather grease gun and multi-purpose EP grease.

2

Locate all grease fittings - typically 15-20 points on mini excavators.

3

Grease boom pivot points (2-4 fittings).

4

Grease arm/stick pivot points (2-4 fittings).

5

Grease bucket pivot and link pins (4-6 fittings).

6

Grease swing bearing and motor.

7

Grease blade/dozer pivot points if equipped.

8

Grease track tensioner grease fitting.

9

Wipe excess grease from all fittings.

Video Resources

No videos added yet.

Add helpful YouTube tutorials for this repair job.